Batavia Landfill Superfund Site
Mr. Breen was retained by NL Industries, Inc., to develop a cost allocation model, which was used to assign costs for the proposed landfill remediation for the City of Batavia Landfill Superfund Site, in Batavia, NY. The cost allocation model used a linear matrix methodology to assign cost for each PRP based on the volume of waste and the mobility and toxicity of constituents present in the waste stream from each PRP. The model used a numerical weighting factor for each criterion and calculated the resulting cost for each PRP based on a percentage of the total estimated cost for implementation of the final remedy. The model was prepared for binding arbitration as a rationale for a reduced remediation cost to NL Industries (NL Industries was considered to be the primary PRP and initially assigned 90% of the overall remediation costs). Mr. Breen’s analysis provided the technical rationale for the arbitrators to reduce the allocation to NL Industries from 90 to 50%, which represented a cost reduction of approximately $4 million.
BGM’s Focus
cost / risk evaluation
Location
Batavia, New York, USA
Regulatory Jurisdiction
USEPA Region 3
