Textin Superfund Site, Texas City, TX.

Site Description:

  • 120 acres site with 7 ponds
  • operating tin smelter through the 1980s
  • 3 groundwater zones, identified as shallow (zone 2), middle (zone 4) and deep (zone 6) transmissive zones
  • soils and groundwater impacted with low pH water resulting in elevated levels of lead and arsenic
  • radioactive material impacts also present
  • the final project was completed in 2003, sale of the site was concluded in 2005

BGM is providing ongoing technical support and additional modelling related to the groundwater management design.

The groundwater model constructed by BGM was integral to developing an alternative remedy that addressed USEPA’s Remedial Action Objectives (RAOs).

The model demonstrated:

  • The migration of lead in the upper transmissive zone was pH dependent.
  • Groundwater management could be accomplished using hybrid trees along the downgradient extent of impacts in the shallow transmissive zone coupled with slurry walls and surface infiltration controls.
  • A natural soil cap could be used in-place of stabilizing the soil and slag on-site.
  • Capping of the existing ponds will help to neutralize low pH water and prevent vertical migration of metals into the shallow transmissive zone.

BGM’s Focus

BGM providing ongoing technical support and additional modelling related to the groundwater management design.
Alternative remedy reduced costs by > $50 million over initial remedy specified in ROD.
Alternative remedy support by BGM risk based contaminant transport model.
BGM model used to develop alternative groundwater remediation system utilizing a combined phytoremediation and slurry wall design.
The Site was issued one of the first Ready for Reuse determinations by EPA in December of 2003.
Five Year Review concluded the alternative remedy was performing as designed.
BGM is providing ongoing groundwater model, hydrogeologic, and geochemical support to Project Navigator, Ltd.

Location
Texas City, Texas

Regulatory Jurisdiction
EPA Region 6

Mark Landress

Project Manager at Project Navigator, Ltd
Frank did excellent work on groundwater modeling for the former Tex Tin Superfund site where we needed to evaluate changes in the installed remedy for future redevelopment of the site as part of a property sale transaction. Frank worked on the original site modeling and the new model work was pivotal in closing the sale transaction. Great work.