Muskegon Chemical Superfund Site
BGM conducted an evaluation of the regional geology and hydrogeology for the area surrounding the Muskegon Chemical Superfund Site in Whitehall, Michigan. Historically, a pump and treat remedial option has been utilized at the site for the removal of dissolved phase chlorinated solvents. At that time, the City of Whitehall was in the process of developing additional groundwater resources for municipal supply, which included the utilization of a municipal supply well near the Site. BGM was retained to evaluate the well head protection plan (WHPP) developed by the city’s consultant and to develop a more detailed three-dimensional geologic model and groundwater flow model to look at alternative municipal pumping scenarios which will not effect groundwater gradients at the site. The issues related to the groundwater supply were resolved.
BGM’s Focus
Review WHPA Plans to determine if the proposed municipal pumping will alter groundwater flow at the site.
Develop regional geologic conceptual model.
Evaluation regional groundwater flow and water supply.
Well head protection studies.
Municipal water supply.
Chemical transport in groundwater.
Location
Whitehall, Michigan USA
Regulatory Jurisdiction
USEPA Region 5
